Case Studies

A track record measured in homes connected, not promises made.

Selected programmes from our Tier 1 delivery record. Each one is evidenced with production rates, first-time-pass data, and client sign-off. Detailed references available on request during the tender stage.

FTTP Build South London Q3 2025

South London overbuild — 4,200 homes

End-to-end FTTP delivery for a Tier 1 framework holder across three South London boroughs. Survey through test, with full claim packs submitted within 5 working days of completion.

4.2k
Homes connected
14wk
End-to-end programme
100%
First-pass claims
FTTP Build Portsmouth Q4 2025

South Coast rollout — 6,100 homes

Multi-phase FTTP overbuild across Portsmouth and surrounding towns, including significant MDU and terrace-property coverage. Delivered through a challenging Q4 weather window.

6.1k
Homes connected
86m
Avg metres/day/gang
97%
Reinstatement first-pass
Civils North London Q2 2025

Multi-utility service driver — 320 plot new-build

Enabling civils across telecoms, water, gas, and power for a 320-plot residential new-build scheme. Single Rise project manager coordinated all four utility streams against the main contractor's programme.

320
Plots enabled
4
Utility streams
0
Programme slippage
EV Civils Home Counties Q1 2026

EV hub enabling civils — 14-charger site

Enabling civils for a 14-bay ultra-rapid EV charging hub on a retail park site, including DNO-coordinated HV cable route, plinth prep, and surface reinstatement. Site handed over energisation-ready on programme.

14
Charger bays
7wk
Civils programme
On
Energisation date
FTTP Build Central London Q1 2026

Westminster MDU programme — 1,800 units

MDU-heavy FTTP programme across Westminster, including listed building access and consented works in sensitive streetscapes. Customer-access surveys and per-block sequencing managed in-house.

1.8k
Units connected
42
MDU blocks
100%
Consent compliance
Grid Connection West Midlands Q4 2025

Substation enabling civils — solar+BESS site

HV cable routing and substation enabling civils for a utility-scale solar farm co-located with a battery energy storage system. Delivered across a 9-week programme to DNO spec.

33kV
HV routing
9wk
Civils programme
DNO
Coord & sign-off

"Rise deliver exactly what is promised. They focus on relationship before anything which makes the remainder of the process smooth and efficient."

Circet — Tier 1 framework holder

Want specifics?
Named references available on tender.

We are happy to share named client references, detailed evidence packs, and live claim samples during the tender stage. Start a conversation.